CHUNICHI PRECISION MOLDING, INC.


CHUNICHI PRECISION MOLDING, INC.

ADDRESS: 498 W Wrightwood Ave.
Elmhurst, IL 60126
TEL: 630-501-1312
FAX: 630-501-1055

 

Company Profile

Company Name:

Chunichi Precision Molding, Inc.

Date of Foundation:
25th March 2005
Capital Fund:
US$500,000.-
Address:

498 W Wrightwood Ave.
Elmhurst, IL 60126

TEL:
630-501-1312
FAX:

630-501-1055

President:
Kota Nakashima
Share Holder:
Chunichi Craft Co., Ltd (Japan): 70%
Chunichi Mold Co., Ltd (Japan): 30%
Headquarters:

Chunichi Craft Co., Ltd
1-3-21 Miyuki Cho, Kasugai City,
Aichi, 486-0953, Japan
TEL: +81 (568)-31-4005
FAX+81(568)-33-8004

Affiliate Companies:
Chunichi Mold, Co., Ltd (Kasugai, Aichi, Japan)
Rise Plastic, Co., Ltd. (Saitama, Saitama, Japan)
Bank:
Mizuho Corporate Bank,Chicago Branch
Fifth Third Bank
Main Products:
Design & Manufacturing of Mold for Plastic Injection Molding.
Maintenance & Repair of Mold Preproduction Plastic Parts by Injection Molding.
Specialty:
Mold for Double Color Injection Molding. (For Button, etc)
Mold for Insert Molding.
Availability also included in Mold for Die cast.
Range of Production:
`150ton Injection Molding Machine Size


Plant facilities

Machinery Equipment
Machine and Equipment Maker Model /Serial Number
QTY
1
Vertical Machining Center LEBLOND MAKINO  
1
2
CNC EDM Sinker MITSUBISHI M25K
1
3
Lathe TAKISAWA TSL-800
1
4
Surface Grinder NICCO NSG 520
1
5
Wire Cut EDM MITSUBISHI DWC 90SB
1
6
Surface Grinder JONES & SHIPMAN 540
1
7
Vertical Milling Machine    
1
8
Bandsaw AMADA HA250
1
9
Vertical Band Saws    
1
10
6" Bench Grinder   JBG-6A/ 7032368
1

 

Injection Molding Machine
Machine and Equipment Maker Model /Serial Number
QTY
1
SH50 N4 (50ton) SHI MOBD 0101
1
2
J150SSA (150ton) JSW 287710374
1
3
Roboshot 110R (100ton) Cincinnati 4066A02/96-21
1

 

Others
Machine and Equipment Maker Model /Serial Number
QTY
1
Work Table -  
2
2
Mold RACK -  
3
3
Dryer CONAIR DRB21
1
4
Grinder NISSEI D1
2
5
Mold Temp. Controller TCU DU1175 / 409617
2
6
CAD/CAM VERO International VISI CAD
1

Above facilities will be ready by End July 2005.

 

External View of Factory Main Entrance
External View of Factory Main Entrance

Sumitomo 50ton Roboshot 100ton
Sumitomo 50ton Roboshot 100ton

Machining Center
Wire EDM
Machining Center Wire EDM


EDM Sinker
Surface Grinder
EDM Sinker Surface Grinder